Construction has now commenced at our East Perth development, Garden Towers, thanks to the team at Hanssen Construction.
The $270 million single-stage project, already 60% sold, will comprise 331 apartments and 1,283m² of ground-floor commercial tenancies which includes the repurposing of the heritage-listed, former Materials Science Building.
A range of resort-style facilities will be included at Garden Towers to enhance the lifestyles of its residents, including the Level 36 Skydeck which features a bar, multiple lounges, a rooftop dining room and private glamping.
Located directly opposite Queens Gardens, 200m from the WACA and just minutes from the Swan River and the CBD, this development will provide a connected lifestyle for residents to live, work, shop, and socialise all within walking distance from their home.
Throughout the construction process, the use of bubbledeck as a slab construction material reduces the use of concrete by a third. This system is used to remove transportation from roadways, accredited construction waste removal and recycling and careful material selection to reduce lifecycle impacts.
The use of Bubbledeck at Garden Towers will save over:
To find out more about Garden Towers, visit the website
Follow us on social media to stay updated with the construction progress at Garden Towers
Comments